FastSaying
Don't bring on the design engineers too soon. One of the worst things you can do in the early phases of a project is to bring on a bunch of detailed design engineers and then not give them clear direction and close supervision.
Bruce Pittman
Bring
Bunch
Clear
Close
Design
Detailed
Direction
Early
Engineers
Give
Phases
Project
Soon
Supervision
Them
Then
Things
Too
Worst
You
Related Quotes
Spend 10% of the project budget making sure you understand problem, the key technologies involved, and have looked at all of the options before you dive into the detailed design.
— Bruce Pittman
Before
Budget
Design
If you have a Falcon Heavy, and you have a Dragon, and you have a Bigelow module, then all of a sudden, life gets interesting.
— Bruce Pittman
Dragon
Falcon
Gets
Keeping the risk management plan up to date can transform it from a door stop into a vital project management tool. Remember: what you don't know can kill your project.
— Bruce Pittman
Date
Door
Keeping
Keep the team as small as possible. Having been on several of these mega-projects, they seem to grow magically. People are attracted to the project like moths to a flame.
— Bruce Pittman
Attracted
Been
Flame
Get the entire team involved in identifying and evaluating project risks. Everyone looks at the project differently, and sometimes the input from the student intern can be vital.
— Bruce Pittman
Differently
Entire
Everyone